You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
02 Jun 2020 / Singapore
From 1 June to 30 September 2020, works are underway off West Coast Park, within the working area bounded by the following coordinates (WGS 84 Datum):
1) 01 deg. 17.817'N / 103 deg. 45.635'E
2) 01 deg. 17.809'N / 103 deg. 45.644'E
3) 01 deg. 17.802'N / 103 deg. 45.637'E
4) 01 deg. 17.808'N / 103 deg. 45.627'E
According to the Maritime and Port Authority of Singapore Port Marine Notice No.032 of 2020 dated 1 June 2020, the works are being conducted 24 hours daily, including Sundays and Public Holidays.
Works include repairing and painting of structures for west coast park promenade lookout jetty. A safety boat will be in attendance to warn and direct craft in the vicinity to keep clear of the working area.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the work area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 25 (Pasir Panjang Control);
and
e) Communicate with Pasir Panjang Control for assistance, if required.
For information about operations in Singapore, contact GAC Singapore at [email protected]