You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
17 Jul 2020 / Singapore
The working area for works at Tuas Western Coast have been revised, with effect from 20 July 2020 to 19 January 2021.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.046 of 2020 dated 16 July 2020, the works will be conducted 24 hours daily - including Sundays and Public Holidays - within the working areas bounded by the following coordinates (WGS 84 Datum):
WORKING AREA A
1 1°20.287'N 103°38.026'E
2 1°20.303'N 103°37.959'E
3 1°20.277'N 103°37.861'E
4 1°19.398'N 103°37.332'E
5 1°19.406'N 103°37.320'E
6 1°19.067'N 103°37.118'E
7 1°18.770'N 103°36.986'E
8 1°18.663'N 103°36.978'E
9 1°18.525'N 103°36.917'E
10 1°17.503'N 103°36.624'E
11 1°17.565'N 103°36.583'E
12 1°16.922'N 103°36.411'E
13 1°16.904'N 103°36.609'E
14 1°17.042'N 103°36.752'E
15 1°18.434'N 103°37.121'E
16 1°18.487'N 103°37.198'E
17 1°18.478'N 103°37.226'E
18 1°18.157'N 103°37.108'E
19 1°18.111'N 103°37.230'E
WORKING AREA B
20 1°19.857'N 103°37.355'E
21 1°19.810'N 103°37.430'E
22 1°19.032'N 103°36.965'E
23 1°19.284'N 103°36.995'E
The work involves dredging and dumping operations, as well as:
A safety boat will be deployed in the vicinity of the working area to warn other craft and vessels of the work.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control for assistance, if required.
For information about operations in Singapore, contact GAC Singapore at [email protected]