You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
22 Jan 2020 / Singapore
The working area for works being conducted at Tuas Western Coast has been revised.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.002 of 2020, until 19 July 2020, the works are being carried out 24 hours daily - including Sundays and Public Holidays - within the working area bounded by the following coordinates (WGS 84 Datum):
WORKING AREA A
1) 1 deg. 20.287'N / 103 deg. 38.026'E
2) 1 deg. 20.303'N / 103 deg. 37.959'E
3) 1 deg. 20.277'N / 103 deg. 37.861'E
4) 1 deg. 19.398'N / 103 deg. 37.332'E
5) 1 deg. 19.406'N / 103 deg. 37.320'E
6) 1 deg. 19.067'N / 103 deg. 37.118'E
7) 1 deg. 18.770'N / 103 deg. 36.986'E
8) 1 deg. 18.663'N / 103 deg. 36.978'E
9) 1 deg. 18.525'N / 103 deg. 36.917'E
10) 1 deg. 17.503'N / 103 deg. 36.624'E
11) 1 deg. 16.917'N / 103 deg. 36.467'E
12) 1 deg. 16.906'N / 103 deg. 36.581'E
13) 1 deg. 17.084'N / 103 deg. 36.763'E
14) 1 deg. 18.434'N / 103 deg. 37.121'E
15) 1 deg. 18.487'N / 103 deg. 37.198'E
16) 1 deg. 18.478'N / 103 deg. 37.226'E
17) 1 deg. 18.157'N / 103 deg. 37.108'E
18) 1 deg. 18.111'N / 103 deg. 37.230'E
WORKING AREA B
19) 1 deg. 19.857'N / 103 deg. 37.355'E
20) 1 deg. 19.810'N / 103 deg. 37.430'E
21) 1 deg. 19.032'N / 103 deg. 36.965'E
22) 1 deg. 19.284'N / 103 deg. 36.995'E
The work involves dredging and dumping operations, and also includes:
- Installation, shifting and maintenance of navigational buoys.
- Shifting, installation and maintenance of temporary jetty within the working area.
- Construction and maintenance of silt barricade within working area.
- Removal of rocks at existing revetments and construction of rock revetments.
- Re-handling works within working area.
- Sand re-handling works from APTE1 to TWC reclamation area.
- Receiving of external sand.
- Survey: Pre/Post survey, Interim, Progress (Monthly) and 3 monthly survey.
- Transportation and Dumping of Dredged material from TWC to TTP2.
A safety boat will be deployed in the vicinity of the working area to warn other craft and vessels of the work.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required.