Replacement of fenders

12 Feb 2020 / Mumbai, India

Bharat Petroleum Corporation Ltd have advised the shut-down of LB-1 at JN Port, Sheva Navi Mumbai, from 13 to 14 February, to replace damaged fenders.

LB-1:
No POL will be berthed but edible oil & chemicals others than A class shall berth. South side will be available for berthing vessels up to 170 metres LOA for non-POL subject that the vessel master agrees and issues NOC.

LB-2:
POL vessels can be taken on LB-2 subject to draft and DWT. If permitted by the vessel master and NOC, non-POL vessels will be allowed to berth.

According to the Trade Notice dated 11 February 2020, the intention is to shut-down tentatively from 13 February to 14 February (36 hours) as 4 low tides are required to complete the job.

Tank farms can carry out maintenance HOT/COLD work during the shut-down period with prior intimation and schedule work plan if no POL vessel is at LB-2.

For information about operations in India, contact GAC India at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.