You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
14 Jul 2020 / Singapore
The working period for reclamation works at Ayer Merbau Basin has been extended. The works will now be carried out until 9 January 2021.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.045 of 2020, the works are being conducted 24 hours daily - including Sundays & Public Holidays - within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 1 deg. 16.169’N / 103 deg. 44.006’E
2) 1 deg. 15.917’N / 103 deg. 44.169’E
3) 1 deg. 15.677'N / 103 deg. 43.866'E
4) 1 deg. 15.781’N / 103 deg. 43.785’E
The reclamation works include removal of undersea de-commissioned cables, debris and existing rock revetment, dredging, sand filling and shore protection.
A safety boat is deployed in the vicinity of the working area to warn other craft of
the project.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear of the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and to navigate with caution;
d) Maintain a listening watch on VHF Channel 68 (West Control);
and
e) Communicate with West Control for assistance, if required.
For information about operations in Singapore, contact GAC Singapore at [email protected]