Reclamation work at Pulau Tekong

29 Mar 2023 / Singapore

The working period for reclamation work at Pulau Tekong has been extended, and the work is now being carried out until 21 September.

According to the Maritime And Port Authority Of Singapore Port Marine Notice No.25 of 2023, the works are being conducted 24 hours daily - including Sundays & Public Holidays - within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 01˚ 25.910'N / 104˚ 03.472'E
2) 01˚ 26.260'N / 104˚ 03.480'E / Yellow Pillar/ Fl Y 2s/ Tekong-20
3) 01˚ 26.544'N / 104˚ 02.353'E / Black/Yellow Pillar/ Q Fl/ Tekong-19
4) 01˚ 26.271'N / 104˚ 01.343'E / Yellow Pillar/ Fl Y 4s/ Tekong-18
5) 01˚ 25.488'N / 104˚ 00.444'E / Green Conical/ Fl (3) G 15s/ Tekong
6) 01˚ 25.167'N / 104˚ 00.434'E / Yellow/Black/Yellow Pillar/ Q(9)15s/ West Tekong
7) 01˚ 23.350'N / 104˚ 01.057'E / Green Conical/ Fl G 2s/ Tekong-3
8) 01˚ 20.090'N / 104˚ 04.899'E
9) 01˚ 20.090'N / 104˚ 05.009'E / Yellow/Black Pillar/ Q(6) + LFl 5s/ South Nelayan
10) 01˚ 20.313'N / 104˚ 05.215'E
11) 01˚ 20.375'N / 104˚ 05.212'E
12) 01˚ 20.752'N / 104˚ 04.944'E
13) 01˚ 21.406'N / 104˚ 04.608'E
14) 01˚ 21.750'N / 104˚ 04.690'E / Red Can/ Fl R 4s/ Red Calder
15) 01˚ 23.489'N / 104˚ 05.338'E
16) 01˚ 23.661'N / 104˚ 05.391'E / Red Can/ Fl R 10s/ Tekong-22
17) 01˚ 23.985'N / 104˚ 05.423'E
18) 01˚ 24.237'N / 104˚ 05.408'E
19) 01˚ 24.376'N / 104˚ 05.375'E / Red Can/ Fl R 2s/ Tekong-23
20) 01˚ 24.481'N / 104˚ 05.260'E
21) 01˚ 24.535'N / 104˚ 05.110'E
22) 01˚ 24.310'N / 104˚ 01.759'E
23) 01˚ 24.227'N / 104˚ 01.665'E
24) 01˚ 24.294'N / 104˚ 01.571'E
25) 01˚ 24.574'N / 104˚ 01.623'E
26) 01˚ 24.589'N / 104˚ 01.772'E

The reclamation work involves filling, dredging, construction of revetment, soil investigation, and soil improvement works.

The soil improvement works will entail dredging, sand piling and deep cement mixing. The dredgers will be used for the bund construction within the working area.

Safety boats will be in attendance to warn and direct craft in the vicinity to keep clear of the working area.

Craft involved in the works exhibit the appropriate local and international day and night signals.

When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear of the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and to navigate with caution;
d) Maintain a listening watch on VHF Channel 21 (Sembawang Control);
and
e) Communicate with Sembawang Control for assistance, if required.

For information about operations in Singapore, contact GAC Singapore at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.