You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
22 Dec 2023 / Tuticorin, India
MV DARYA JAYA working at NCB-I completed cargo operations and awaiting sailing. The terminal is currently operating with own power and vessels declared for NCB-I will be taken for cargo operations as usual.
Operations at VOC-4 berth resumed with the berthing of a Urea vessel – MV PACIFIC ACHIEVEMENT, working with ship’s power.
Berth No. 9 has also resumed operations with Coal vessel discharging cargo with shore crane powered by generators. Cargo is being discharged onto the wharf since the conveyor system requires power.
With the flood water receding, labourers have started reporting in small numbers for work. Few trucks have also started plying in the port.
Power supply to the Port has been reinstated by 21st December.
For further details and updates, as well as information about operations in India, contact GAC India at [email protected].