You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
17 Jul 2020 / Hong Kong
A temporary loading facility has been established at Cha Kwo Ling. The facility has one discharging platform protruding about 10 metres seawards from the seawall. The temporary loading facility will operate for a period of approximately 13 months.
Two dumb lighters, one Ro-Ro barge and one tugboat will berth at the facility within the operation area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (D) and the adjacent shoreline for loading operation:
(A) 22 deg. 17.923’N / 114 deg. 13.746’E
(B) 22 deg. 17.902’N / 114 deg. 13.707’E
(C) 22 deg. 17.963’N / 114 deg. 13.666’E
(D) 22 deg. 17.980’N / 114 deg. 13.696’E
The hours of operation will be from 0700 hours to 1900 hours. No operation will be carried out on Sundays and public holidays. Except the Ro-Ro barge, the remaining vessels employed for the operation will not stay in the operation area outside the hours of operation.
(For information about operations in Hong Kong, contact GAC Hong Kong at [email protected])
Source: Government of the Hong Kong SAR Marine Department Notice No.101/2020