You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
13 Jul 2023 / Hong Kong
For approximately six months, marine site investigation works involving sampling of subsea soil, drilling of boreholes and cone penetration tests will be carried out within the area bounded by straight lines joining the following co-ordinates (WGS 84 Datum) from (A) to (W) and the adjacent shorelines:
(A) 22° 19.753’N 114° 03.397’E
(B) 22° 18.953’N 114° 04.133’E
(C) 22° 18.476’N 114° 04.455’E
(D) 22° 18.616’N 114° 04.687’E
(E) 22° 17.941’N 114° 05.147’E
(F) 22° 17.786’N 114° 04.835’E
(G) 22° 17.611’N 114° 04.965’E
(H) 22° 17.310’N 114° 05.790’E
(I) 22° 17.208’N 114° 05.832’E
(J) 22° 16.975’N 114° 05.561’E
(K) 22° 16.782’N 114° 02.892’E
(L) 22° 16.858’N 114° 02.884’E
(M) 22° 17.290’N 114° 03.718’E
(N) 22° 17.798’N 114° 03.685’E
(O) 22° 17.942’N 114° 03.850’E
(P) 22° 18.255’N 114° 04.137’E
(Q) 22° 18.799’N 114° 03.913’E
(R) 22° 19.125’N 114° 03.625’E
(S) 22° 19.182’N 114° 03.186’E
(T) 22° 19.242’N 114° 03.212’E
(U) 22° 19.210’N 114° 03.386’E
(V) 22° 19.327’N 114° 03.492’E
(W) 22° 19.615’N 114° 03.296’E
The works will be carried out by two flat top barges and one jack-up barge. One work boat and two tugboats will provide assistance. Vessels engaged in the works will display signals as prescribed in international and local regulations.
A working area of approximately 50 metres will be established around each barge. Yellow marker buoys fitted with yellow flashing lights will be laid to mark the positions of the anchors extending from the flat top barges.
Yellow flashing lights will be installed at the four corners of the jack-up barge to indicate its position.
The hours of work will be from 0800 to 2300 hours. No works will be carried out on Sundays and public holidays. Vessels employed for the works will stay in the works area outside the hours of work.
Vessels navigating in the vicinity should proceed with caution.
(For information about operations in Hong Kong, contact GAC Hong Kong at [email protected])
Source: Government of the Hong Kong SAR Marine Department Notice No.115/2023