You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
22 Dec 2023 / Krishnapatnam Port, India
On December 21, the port brought in MV ALTUS (arrival draft: Fwd 11.31 M, Aft 11.68 M) alongside Berth No. 4 for discharging 49465 MT Urea. Another vessel, MV STAR SKY (arrival draft: Fwd 4.50 M and Aft 6.80 M), was also accommodated for loading Barytes.
Further, the port is planning to bring in MV JAL KUMUD today, with an expected arrival draft above 13.00 M.
Dredging is progressing with 2 x Dredgers, and a dredging survey is being conducted every 12 hours.
According to port sources, all efforts are in place to pull up the stranded vessel during the highest tide available on 24 December. Six tugs are in position for this operation, with another being brought in from the nearby Gangavaram port.
Understandably, senior officials from the Adani Group have arrived at Krishnapatnam Port to assess the situation.
For further details and updates, as well as information about operations in India, contact GAC India at [email protected].