Installation of floating pontoons at Republic of Singapore Yacht Club

23 Feb 2023 / Singapore

From 20 February to 19 August, floating pontoons are being installed in the vicinity of Republic of Singapore Yacht Club, within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 01° 17.746'N / 103° 45.580'E
2) 01° 17.705'N / 103° 45.649'E
3) 01° 17.626'N / 103° 45.603'E
4) 01° 17.668'N / 103° 45.534'E

According to the Maritime and Port Authority of Singapore Port Marine Notice No.16 of 2023, the working hours are from 0800 to 1900 hours daily, including Sundays and Public Holidays.

The installation of floating pontoons will be carried out by crane barge and supported by work barges and tug boats.

Craft involved in the work will exhibit the appropriate local and international day and night signals.

When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 25 (Pasir Panjang Control);
and
e) Communicate with Pasir Panjang Control on VHF Channel 25 for assistance, if required.

For information about operations in Singapore, contact GAC Singapore at [email protected]

If quoting any content from Hot Port News, please cite GAC Hot Port News as the source.