You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
13 Feb 2024 / Marcus Hook, United States
As advised by Monroe Energy, following post-dredging dock soundings were performed at the Marcus Hook ship dock, the depth has changed. The barge dock was not dredged due to permit restriction.
The current depth at the ship dock, referenced to the MLLW datum, is changed to 40’00” (12.19 m). The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 39’ 00” (11.88 m).
Th current depth at the barge dock, referenced to the MLLW datum, is 29’00”. The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 28’ 00”.
For information about operations in the United States, contact GAC North America at [email protected]