You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
21 Jan 2020 / Singapore
The working period for demolition works at Southern Tuas Basin has been extended.
According to the Maritime and Port Authority of Singapore Port Marine Notice No.001 of 2020, until 19 July 2020, the works are being conducted 0730-1930 hours Monday to Saturday and 0800-1800 hours on Sundays and Public Holidays at Southern Tuas Basin, within the working area bounded by the following co-ordinates (WGS 84 Datum):
1) 01 deg. 18·368'N / 103 deg. 39·051'E
2) 01 deg. 18·341'N / 103 deg. 39·079'E
3) 01 deg. 18·160'N / 103 deg. 38·910'E
4) 01 deg. 18·190'N / 103 deg. 38·879'E
The work includes demolition of auxiliary facilities, cutting of beams and piles and dolphins. A safety boat will be deployed to warn other craft in the vicinity of the working area.
When in the vicinity of the working area, mariners are reminded to:
a) Keep well clear and not to enter the working area;
b) Maintain a proper lookout;
c) Proceed at a safe speed and navigate with caution;
d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
e) Communicate with Jurong Control on VHF Channel 22 for assistance, if required.
For information about operations in Singapore contact GAC Singapore at [email protected]