You are currently on GAC Worldwide website.
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
16200 Central Green Blvd
GAC Regional Office, Asia Pacific 78 Shenton Way, #29-01
Group Vice President, Asia Pacific & Indian Subcontinent
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Unit OT 18-35, Level 18, Central Park Towers, Dubai International Financial Centre, Dubai, P.O. Box 18006, United Arab Emirates
Leverage on our experience and expertise with integrated shipping, logistics and marine services tailored to meet your needs.
16 Mar 2023 / Marcus Hook, United States
Post dredge dock soundings were performed at the ship and barge docks on Wednesday 3/8/23. Both dock depths have changed.
Ship Dock:
Current depth at the ship dock, referenced to the MLLW datum, is changed to 40'00" (12.19 m). The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 39' 00" (11.88 m).
Barge Dock:
Current depth at the barge dock, referenced to the MLLW datum , is change to 30'00". The terminal has a 1-foot minimum UKC requirement. The maximum allowable FW draft is 29' 00". The hydrographic survey for the ship dock is attached.
(For further details, as well as information about operations in the United States, contact GAC North America at [email protected])
Source: Maritime Exchange for the Delaware River and Bay update of 15 March 2023